For utility operations and line contractors

Every Work Order, Proven on the Asset — Crew, Time, Photos, GPS

For the operations coordinator who has to show the client and the regulator that the pole, valve or meter set was actually worked, when, and by whom. Works in vaults and rural substations with no signal.

or

By continuing, you agree to the Terms of Use and the Privacy Policy.

No credit card required · No sales call · Cancel anytime

A crew day on the distribution system

From the morning dispatch to the closed work order with evidence — as the coordinator and the crew live it.

1
6:30 AM · Ops center

Work orders dispatched per crew

The coordinator assigns the day: a pole change-out, valve exercising on a main, a leak survey follow-up. Each work order sits on its asset on the map, with priority, due date and the form that job type requires.

2
7:45 AM · First site

Arrival recorded, job briefing filled

GPS records the crew's arrival at the pole. The foreman runs the job briefing on the phone — hazards, PPE, grounding, energized or de-energized — with every crew member listed on it.

3
During the job

Before, asset tag, after

Photos of the asset before the work, the nameplate or tag, and the finished job — coordinates, time and author inside each file, attached to that asset's record. Parts used and crew hours logged on the same screen.

4
Something found

Occurrence logged, new work order

A hot connector, a tree in the right-of-way, gas odor at a meter set. Logged as an occurrence with photo and priority; the coordinator sees it on the map as soon as the phone reconnects and turns it into a work order.

5
5:00 PM · Ops center

Closed work orders, ready for the client

Work orders closed today, per crew, with hours and evidence. One PDF per work order or a batch for the invoice backup. The asset keeps the visit in its history.

Every work order. Every asset. Proven.

See your entire network on one map

Sound familiar?

The work gets done. Proving it is where the day goes.

The invoice comes back with units rejected

Unit-price contract, 30 work orders a day per crew. The utility's auditor wants a before and after photo with the asset ID on every unit. The photos are in the foreman's phone, with no time and no coordinates — the unit gets cut from the invoice.

A customer complaint and you have to prove the crew was there

The complaint says nobody showed up. The work order says complete. Without an arrival time tied to that address you argue with a customer instead of closing the file with the commission.

Asset history lives in the truck

When was that valve last exercised? When did that transformer get changed out? The answer is in a binder, a spreadsheet nobody maintains, or the memory of the lineman who retires in June.

A tree takes out a feeder and nobody can find the trim records

The outage counts against SAIDI and SAIFI. The regulator asks when that span was last cleared. The vegetation contractor's report is a PDF with a total, not a map of what was cut.

Vaults, regulator stations and the far end of the territory have no signal

The form app needs internet. So the crew writes on paper and someone re-types it back at the ops center. That someone is you.

What the utility and the regulator ask you to prove

Each requirement and the capability that answers it — recorded as the crew works, not reconstructed the night before the audit.

Each work order completed on the right asset, when, and by which crew

Utility client · unit-price invoice backup

GPS arrival per crew member, before and after photos with coordinates and time inside the file, assignee and status on the work order, one PDF per order.

Job briefing before each job, with hazards, PPE and crew present

OSHA 29 CFR 1910.269 · Job briefing

A form per job type with required fields, filled on the phone before work starts; time, location and author recorded automatically and kept in the asset's history.

Arrival and restoration times per outage event

State PUC / PSC · SAIDI and SAIFI reporting

Occurrences logged with GPS and photo; each entry keeps the real time it was filled, even offline, so the timeline holds up when a complaint is reviewed.

Vegetation clearance on the right-of-way, span by span

Utility vegetation management plan · ROW

The span is a folder with its area on the map — walk it and the area is drawn by GPS. Before and after photos are georeferenced, so the cycle can be shown for that exact stretch of line.

Leak survey, repair and follow-up records on distribution mains

PHMSA 49 CFR 192 · Distribution integrity

Each main segment or meter set is an asset with its own history: survey form, leak grade recorded as a field, repair photos and the follow-up work order.

Labor hours, location and work performed per crew for storm cost recovery

FEMA Public Assistance · Storm restoration

Timesheet per person per site with labor cost, daily GPS route, photos and expenses with receipt — exported as PDF per storm folder.

Built for utility field operations

Six things a utility or a contractor needs from a field app — nothing pretending to be your GIS or your OMS.

Your service territory, asset by asset

Upload the feeders, mains and poles from your GIS as Shapefile, KML or GeoJSON. Every pole, transformer, valve and meter set is a record with its own history of work orders, photos and forms.

Work orders on the crew's phone

Assignee, priority, due date, status. Forms per job type — pole change-out, valve exercising, leak repair — with required fields and voice dictation for the notes.

Works in vaults and dead zones

Forms, photos, hours and GPS are saved on the phone and sync when the signal returns, keeping the time they were filled.

Evidence that survives the audit

Photos carry coordinates, altitude, date, time and author inside the file. Reports come out as PDF from what was recorded, with a review and approval step before anything counts as done.

Jos.IA builds the forms in your vocabulary

Tell it your asset types, job codes and inspection items; it sets up templates, fields and groups in about 90 seconds. Ask it later how many hours a crew logged this week.

Crew hours and site presence

Daily route per person, automatic arrival and departure per site, with consent. Hours per person per site with labor cost, hidden from the profiles that should not see it.

Custom Report Builder

Build intervention reports for any asset type

Define custom report templates for transformers, valves, pumps, substations — any asset in your network. Each report type captures the exact data your maintenance protocols require.

Intervention ReportAsset Condition AssessmentFault Diagnosis FormPreventive Maintenance LogNetwork Outage Summary
9:41
Offline

Intervention Report

Substation SE-07

3/5
Type here...
Type here...
Fuse 30A
Save Report
Will sync when online
Works Offline
GPS Tagged
Parts Catalog
Before/After
Asset Linked

See it in action

This is what Geodocs looks like for your team every day.

app.geodocs.io/dashboard
G
Map Dashboard
T
V
S
T
V
OK
Scheduled
Critical
Network Map
Crew Tracking
8 Work Orders
SLA Monitor
Asset Registry

See your entire network on one map

OFFLINE-FIRST

Works where other tools don't

Built offline-first. Your team collects data without signal — photos, GPS, forms, reports. Everything syncs the moment connectivity returns. No data lost. Ever.

True offline mode — not just cached pages
GPS tracking without signal
Photos with metadata saved locally
Smart delta sync when back online

Frequently asked questions

No credit card required

Start managing your utility network on the map

14-day free trial · No credit card required · Full access to all features